# Steward 2026-10-19 — GitHub Actions is out of free minutes again, but the Windows box traded all three sleeves and ran the digest and the capture on its own; with auto-merge down I merged six PRs by hand after testing them; one correction to my Friday report; four asks for you

Window: since the 2026-10-16 steward run (23:00Z) → 2026-10-19 23:00Z. One
trading day: Monday 10-19.
Read: my last two reports (10-15, 10-16) · the GitHub Actions run list
(REST API via `gh api`; GitHub's GraphQL is refused in this container, so
`gh pr list` / `gh run list --json` fall back to REST) · `outbox/daily-audit`
(tonight's 10-19 report, in full) and `outbox/triage` (today's 10-19 report,
in full) · every `beacon/*` branch · `main`'s state, site and skew commits
with their `Runner:` and `Box-Result:` trailers (git) · all 7 open PRs, their
diffs and their merged result · `research/queue/approved/` and the rows the
triage report names.
NOT-READ: broker truth, `thales fleet status` / `portfolio *` (no broker
credentials here); the Mac and the tbx-win box (no access), so the box's own
logs, its digest exceptions and its `unpushed/*` branches are unread; Fleet
Digest annotations (the GitHub digest job was refused today, so there are
none to read).

## Did

- **merged #244** (the Friday email cut each steward headline at 90
  characters). It was tested Friday and held for a weekday. Today's `main`
  plus all six PRs together: the trading gate passed (1251 passed, 1
  skipped) and the full suite passed (1809 passed, 1 skipped).
- **merged #249**: if the steward itself goes dark, the digest now emails you
  on any weekday, not just Friday. This is your 2026-10-18 ruling on my 10-15
  ask, written by your own session next to #248. It only touches the digest
  and the email gate, so tomorrow's orders are unchanged. I ran my own check:
  switching the new exemption off makes exactly its new test fail.
- **merged #255** (the daily audit's fix). A missing capture day used to stop
  being reported once it was more than 20 sessions old, even though nobody
  had written it down. `thales captures` now counts such days down to the
  point where they drop out. It only reports and cannot fail trading or the
  capture. The new research note had 0 redactions in the publish scrub.
- **merged #253** (weekly audit: doc drift after the box cutover, plus 151
  lines of new doc-consistency tests that only add checks) and **#252** (panel
  run 40, which adds queue row BGS-1 and dismisses SCR-1). Both are records.
- **merged #254** (triage's eleven annotations) after updating it onto `main`.
  It and #252 had both appended to the end of the RAD-1 row. I kept both
  annotations, panel first, and dropped nothing. The diff against `main` only
  adds lines.
- Why by hand: auto-merge is a GitHub Actions job, and Actions has refused
  every job since 00:15Z. GitHub accepted squash merges over its REST API, so
  no required check is blocking merges. The daily audit asked me to confirm
  this.
- **Still parked: #245** (the main-push watcher's crash-vs-breach fix). It
  edits a guard script, so only you may merge it. Restated below.
- **No queue approvals.** `approved/` still holds OSR-1 (11 days) and FRZ-1,
  neither built, because the implementer has not run since 10-07. Its next
  slot is Wednesday 10-21, and it builds oldest first. A third approval would
  only queue behind them. **Next in line, ahead of CQA-3:** BGS-1 leg (b).
  When the box's digest finds a sleeve with no run, it still stamps
  `Box-Result: ok`, so GitHub's "SLEEVE DID NOT RUN" job never fires. Until
  that is built, my daily check of the four `Runner:` trailers is the only
  reader of that failure.
- Marked the answered asks in my 10-15 and 10-16 reports `DISCHARGED`, each
  citing the PR that answered it (#248, #249, #251).

## A correction to my 10-16 report

I said the box **skipped** Friday's option capture and that 10-16 was
permanently lost as a skew signal date. That was wrong. Your session's #251
read the box's log: the box **captured on time** (12:08 PT, 881 of 903 names,
capture QA green). Only its `git push` failed: the rebase step had no
committer identity, so the commit never left the box. GitHub's late backup
capture (17:59 ET) is what reached `main`. The same push fault explains
10-13's late meanrev. #251 also says the box failed closed on meanrev that
day. So the box had **zero missed slots** last week, not two. It had a push
bug, and #251 fixes it. My mistake was reading "no commit on `main`" as "the
box did not run". From now on I will say "did not *publish*" unless the box's
log is in front of me. The box's on-time 10-16 capture may still exist on a
local `unpushed/<stamp>` branch on the box. None exists on GitHub (I
checked). See the third ask.

## Alerts

- **Actions out of free minutes since 00:15Z** → real, and only you can fix
  it (spending). All 31 runs today were refused in about 3 seconds each, with
  zero billable time. The daily audit confirmed this. It was forecast (#191
  said around 10-20). Dark until it resets (expected ~11-01): the three
  GitHub backup trading legs, the GitHub digest and its "did not run" job,
  the beacon and outbox relays (tonight's reports will not be mailed; the
  backlog flush sends them when Actions returns), auto-merge, and Main Push
  Watch. Main Push Watch is the watcher for writes that skip the PR gates,
  including writes to `research/queue/approved/`, which only I may approve
  into. I re-ran nothing: every re-run would be refused too.
- **The box: 5 of 5 on time, all `Box-Result: ok`** → healthy. vrp 14:37Z,
  momentum 14:56Z, meanrev 14:58Z, digest and public site 15:30Z, skew 19:08Z.
  This is the first trading day with no GitHub backup behind the box, and it
  passed.
- **The box's failure email is switched off "because the GitHub backup leg
  covers it", and today that leg cannot run** (the daily audit's finding 2)
  → owner-only (it is your email setting). See the second ask.
- **The September capture gaps are about to drop out of the detector**
  (finding 3) → the countdown is now merged (#255). Writing the actual
  per-stream records is queue row GAP-1's job, not mine.
- **AVB**: 27 refused exit orders since 08-17, one more today ("asset is not
  active", meanrev's largest holding). Triage now carries it in the FOS-3 row.
  No new action.

## NEEDS-OWNER

NEEDS-OWNER: GitHub Actions ran out of free minutes on 10-19 (every job refused, expected back ~11-01) — decide whether to pay to restore it or wait ~9 trading days. — My recommendation: wait. The Windows box ran every trading, digest and capture job on time today without GitHub, and I am merging PRs by hand meanwhile. What you give up until ~11-01: a second trading leg if the box fails, auto-merge, the mailed routine reports (they are delivered late, marked [DELAYED]), and the watcher that flags writes to `main` that skip the PR gates. If the box itself fails during this window, paying becomes the better choice. Spending is yours alone; I cannot see billing.
NEEDS-OWNER: decide whether the box's failure emails stay switched off while GitHub's backup leg is down — the code justifies the silence by saying "the GitHub backup leg covers it", and until ~11-01 that leg cannot run. — My recommendation: leave `notifications.email: weekly_digest_only` as it is. Flipping it to `all` turns back on every alert email you switched off on 10-07, not just this one. A box failure is still found the same evening: the daily audit checks at 3pm PT and I check at 4pm PT, both reading the box's commits. The cost is that a failure is found after the close instead of during the session. Momentum only checks volatility on most days, so a missed day costs little. The one exposure is vrp's open SPY put spread (expires 11-20), which no one would manage that day. If you want same-day warning, flip it to `all` until ~11-01 and back afterwards.
NEEDS-OWNER: next time you or an interactive session is on the Windows box, three five-minute jobs: (1) do the admin re-copy of `boot.py` to `C:\thales\bin` that #251 says it needs; (2) look for an `unpushed/<stamp>` branch holding the box's on-time 10-16 option capture and, if it is there, push it as its own PR so 10-16 can still count as a skew signal date; (3) run `thales --sleeve meanrev portfolio reconcile` for 10-13. — My recommendation: (1) matters most. Without it the box's own retry push keeps the bug #251 fixed. (2) recovers a week-42 signal date that every record now calls lost. (3) is the check left over from 10-13. No hard deadline, but (2) is only possible while the branch exists on the box.
NEEDS-OWNER: merge #245 yourself and make the two-line alert-text change to `.github/workflows/main-push-watch.yml` (restated from 10-16) — after a crash the watcher currently says "someone bypassed the PR gates" when it means "could not look". — My recommendation: merge it. I reviewed it on 10-16 and it is correct. It still fails loudly. I may not merge it because it edits a guard script. Low urgency: Main Push Watch is dark until Actions returns anyway.

## Carried forward

- **Implementer, Wednesday 10-21 16:00Z.** If `beacon/implementer` has not
  moved by Wednesday's run, that is a NEEDS-OWNER to restart it at
  claude.ai/code/routines. Triage asks for it the same day, not the next
  Monday. Once it clears `approved/`, approve BGS-1 leg (b) first, then CQA-3,
  then PLB-1.
- **Two 60-session clocks** (`shortability` ~11-02, `options_iv_term` ~11-05)
  have no evaluator and no NORTHSTAR §6 row. NORTHSTAR is yours, and RAD-1's
  ruling (including the Sunday file `data/shortability/2026-07-26`) is yours
  too. Triage raised this as decide-item 2. I am not restating it as a
  NEEDS-OWNER today because there are four asks already. I will if it has not
  moved by Thursday.
- **Hand-merging continues** until Actions returns. Every merge is tested
  first, as today.
- **tbx-win:** I check all five daily commits and their `Box-Result`. Read
  "no commit" as "not published", not "not run".
- **Tool surface:** as before, this session exposed the Claude Code Remote
  tools (`add_repo`, PR-activity subscribe/unsubscribe) alongside GitHub's.
  I called none of them. No Gmail, Calendar, Drive or Docs tools were present.
