Steward 2026-11-12: the box traded every day this week; GitHub Actions is refusing jobs again, so I merged the two stranded PRs by hand; the lost 10-30 capture day is now written up as a fix for next week to merge before its 12-01 deadline; DRO-1 + VRD-1 approved as one build; zero questions for the owner
Window: from my 2026-11-05 run (beacon 23:14Z) to 2026-11-12 23:30Z. Five trading days: 11-06, 11-09, 11-10, 11-11, 11-12.
Read: my last two reports (10-30, 11-05) (READ) · ops/HANDS.md (READ, no open items) · outbox/daily-audit, tonight's report and the 11-05 closing addendum (READ) · outbox/triage (READ, no commit since the 11-06 relay restore) · all 7 beacon/* branches (git, READ) · main's commits since 11-05 with their Runner: / Box-Result: trailers (git, READ) · both open PRs: diffs, plus their merged result tested together (GitHub MCP + git, READ) · research/queue/open/ and approved/ (READ) · thales captures, run here (READ).
NOT-READ: the Actions run list and Fleet Digest annotations. I relied on the daily audit's reading, which says every GitHub job has been refused since 11-07/08, so there is nothing new to annotate. Also NOT-READ: broker truth, thales fleet status / portfolio * (no broker credentials) · the Mac and tbx-win (no access) · the routine control plane · the live thales.report.
Did
- merged #327 (panel run 49): two new rows (PIT-2, COV-2), six annotations, two kills (SHT-1, TRP-1). Auto-merge could not take it because its job was refused. I reproduced its lead claim here:
thales capturesprinted "pit_snapshots: 2026-10-30" as a missing interior day, anddata/pit_snapshots/holds 10-29 and 11-02 but not 10-30. - merged #328 (daily audit). It corrects
ops/DAILY_AUDIT.md§4c: "billable minutes = 0" no longer proves a refusal, because green box-gated runs read 0 too. The new test checks whether any non-skipped job got a runner. Markdown only. One wording nit, not a blocker: "on budget" describes about 650 minutes a month against a ~600 plan, so it is slightly over. The audit's point stands: trimming Thales would not stop an account-wide exhaustion. - Checks before both merges: main + #327 + #328 merged together. Trading gate (the box's command,
--ignore=tests/test_lab): 1335 passed, 1 skipped. Docs consistency: 29 passed. Publish scrub: 0 redactions in all 12 changedresearch/files. Squash-merged, each pinned to the head SHA I reviewed. Neither had a commit from this run. - Authored #329 (PIT-2 built), for the 11-19 run to merge. The missed 11-02 morning run permanently lost the 10-30 point-in-time snapshot, and no ledger recorded it. The PR adds the record to
CAPTURES.mdand the alarm acknowledgement tocaptures.py, with a test pinning both. Checked both ways: with the entry, the warning is gone and the date is still listed as acknowledged; without it, the warning returns. Trading gate 1336 passed, observability 424 passed. Deadline 2026-12-01: after that the date leaves the detector window, and the implementer (12-05) would be too late. 11-26 is the fallback slot. - Approved DRO-1 + VRD-1 as one paired build, DRO-1 first (#330, merged by the 11-19 run so it lands before the 12-05 implementer). This is the P0 exit-4 "exposure left on" alarm on the VRP sleeve. Built alone, VRD-1 would silence a genuine failed close. Neither changes an order. DRO-1's one open loudness question is answered by the owner's 2026-09-06 IGD-1 leg-3 ruling: a failed open stays visible but does not exit 4. That is this week's approval cap. REF-1 (12-01 horizon) still goes first.
- Carried items closed: the options_iv_term kill statistic was read by panel run 49 and reproduced by the daily audit: median 7.0 expiries against a floor of 5, so KEEP. BTB-1's false "0 of 889" premise is now corrected on the row by panel run 49's annotation, which measures 1 to 4 hard-to-borrow names in the universe across the window.
- Decided myself, not asks: GAP-1 is not reopened. Its condition has fired, but PIT-2 records the new notch, and GAP-1's two residuals (detector depth, the 06-17 ledger line) stay where they are for triage's 12-03 sweep. Waiting loses nothing that 12-01 does not already cover.
- Standing ruling applied: the GitHub Actions refusal (third month in a row, from about 11-07, expected to clear about 12-01) is status under "never pay". The box carries trading, captures, the site export and the Friday digest. While the refusal lasts, auto-merge is dark, so every PR, my own reports included, waits for a steward run.
Alerts
- Box: 25 of 25. Every trading day this window, all three sleeves, the site refresh and the skew capture carry
Runner: tbx-win/Box-Result: ok(git trailers). Per the daily audit: zero safety HALTs or REJECTs, momentum drawdown −9.09% against the −20% kill switch. - Actions refusal from 11-07/08 → transient platform, standing ruling → no re-runs, because re-runs would be refused too. The daily audit's residual: while the refusal lasts there is no backup leg and no in-band alarm, so a box outage would surface only through a missing Friday digest. The box is up, so that is not an owner item. Whether that detection gap deserves a queue row is the 11-16 panel's to judge.
- Panel beacon 11-09: its relay was refused, but the branch moved, so it ran. All routines that were due moved. Beacons will not ping healthchecks until the reset.
- AVB: failed exits 41 to 45, all explained. The owner's 10-24 "no action" ruling stands.
- This report will not reach tomorrow's digest unless something merges it first, because auto-merge is dark and I may not merge my own PR. It holds no owner asks, so the owner loses nothing. The 11-19 run merges it.
NEEDS-OWNER
(none)
HANDS
(none)
Carried forward
- 11-19: review #329 (PIT-2) from scratch and merge it before 12-01. Merge #330 (approvals) and this report. Every PR needs a manual merge until the Actions reset (~12-01).
- 12-01: first trading day of December: momentum's selection, the first under #318. Also the oos-monitor monthly verdict and the Mac's monthly re-validation; if there is no new row in
oos_verdict_history.jsonl/research_registry.jsonlby 12-03, that is a NEEDS-OWNER (his hardware). 12-05: implementer: REF-1, then DRO-1+VRD-1. 12-10: the earliest date the December gate can be decided (107/126 that day). - Tool surface: this session exposed the Claude Code Remote tools (
add_repo, PR-activity subscribe/unsubscribe), a PDF viewer, and two failed finance connectors (BigQuery, Slack) alongside GitHub's. I called none of them. No Gmail, Calendar, Drive or Docs tools were present.